Archived

GSS Rig Change Over

GSS mini piling rig change over to form a secant wall to a proposed basement with varying access and operating restrictions in the London area SW3. Photos show the removal of our Klemm KR708 short mast rig used to form a 508/450mm diameter secant wall within restricted headroom, being exchanged for our Klemm KR702-2 to install 406/350mm diameter secant wall […]

GSS Piling Rig Training Day

To accommodate the increased changes in the new piling plant, we have undertaken a full training awareness day for all our mini piling operatives jointly with the rig supplier/manufacturer.

See How Close Our Mini Piling Rigs Can Get!

One of our mini piling rigs close to a Prestigious Building in the London area.

Mini Piling Rig being Lowered into Basement

Our Super Kitten mini piling rig being lowered into a London Building to commence the second phase contiguous mini piling to a 10m depth basement within a restricted headroom.

New Rig – Klemm KR708

We have pleasure in announcing the delivery of our new Klemm KR708 piling rig which is capable of installing 300mm – 600mm diameter piles.  The rig itself is smaller than its sister rig Klemm KR709 with an overall weight of 9.5 tonnes with small dimensions.  The new KR708 has a split mast for working within […]

Thank you!

A huge thanks from all at Geostructural Solutions and GSS Piling to everyone who kindly donated to our worthy Charity ‘Children with Cancer UK’. We have collectively raised approximately £3,000.00. We all had a fantastic day and look forward to the same for next year!

Rail Work

GSS Piling have PTS trained Drillers & Operatives to work in the rail industry using our modern fleet of mini piling equipment. We wish to expand our presence within the rail industry to promote our specialist expertise in restricted access piling and ground engineering solutions. We are currently working with Balfour Beatty Ground Engineering and […]

A (Not so Light) Light Move!

The Lead-in-Light was originally constructed in the nineteenth century and served as a guide for shipping pilots to navigate their way through the difficult and treacherous river estuary.  It is constructed entirely of cast iron and weighs some 20 tonnes.  Originally several similar structures were in use around the harbour estuary but this is one […]

10th Anniversary!

Happy 10th Anniversary to our Sister Company Geostructural Solutions who have just completed 10 years of successful trading and has become one of the leading respected specialist ground work/basement contractor in the market!

Jog On! – All for a Good Cause

Team GSS – Running in the 10K Bupa London Race for Children with Cancer UK Charity 25th May 2014.

Our Sister Company

  • Openings in Buildings - Concrete / Steel
  • Basements - Piled and Underpinned
  • Structural Lifting / Jacking
  • Groundworks - Reinforced Concrete
Visit our website

Member of