News
<<Back to News
Up, Over and In!
GSS Rig Fleet No.7 being craned into site and manoeuvred through tight restricted access into a building to form a new 406/350mm diameter secant piled wall with limited headroom of 3.250m.
Synopsis of Project: -Piling only within building second visit, 50 males piles 9-10m depth, 50 female piles 8m depth and 8 No. temporary works plunge piles varying between 19-23.5m depth.
Part of the

'We are financially strong and benefit from the positive support of belonging to the Morrisroe Group, giving us a combined turnover of in excess of £200 million. This support and the opportunities it affords, along with our well earned reputation will help us to achieve our ambitions.'
Latest News
GSS New Big Rig – SR-95
Press Release: – Morrisroe Group acquires GSS Piling Ltd & Geostructural Solutions Ltd
Loading out GSS Rig Fleet No. 10 – KR702-2R
All News Archived NewsOur Sister Company

- Openings in Buildings - Concrete / Steel
- Basements - Piled and Underpinned
- Structural Lifting / Jacking
- Groundworks - Reinforced Concrete
Member of
