Archived

GSS Rig Change Over

GSS mini piling rig change over to form a secant wall to a proposed basement with varying access and operating restrictions in the London area SW3.

Photos show the removal of our Klemm KR708 short mast rig used to form a 508/450mm diameter secant wall within restricted headroom, being exchanged for our Klemm KR702-2 to install 406/350mm diameter secant wall to accommodate the design specification caused by the access constraints.

Our Sister Company

  • Openings in Buildings - Concrete / Steel
  • Basements - Piled and Underpinned
  • Structural Lifting / Jacking
  • Groundworks - Reinforced Concrete
Visit our website

Member of